It’s been a long time coming with the next step in our house building but this weekend we
finally tackled drywall! We got most of the second floor finished with the help of my Dad and friend Phil who brought along his drywall gun. It sure made a difference and was much easier to use than my cordless drill/driver.
The drywall going up is one of those magical stages in construction that totally changes the character of a house. Rooms get closed off and start to feel like the spaces they will become. The house gets easier to envision with life and people inside it and you feel a lot closer to being done finally!
We should be able to finish most of the drywall evenings this week except for a few areas where the electrician didn’t put boxes in yet.
Phil and I put up the first sheet, Laine decided to focus on our butts instead of the drywall…

drywalling pair
Dad and Phil continue with drywall as I finish up some last minute framing.

expanse of drywall
The all the drywall is done on the second floor except the inside of the bathroom and a small piece or two around electrical and plumbing rough-ins.

check for wobblies
Dad and I check the pocket door framing for rigidity…

framed right
The window in our bedroom is framed perfectly by the doorway!

porch drywall
A bit of the drywall we got done on the first floor and probably the only full, unmodified sheet that will be put up!

kitchen drywall
The other bit we got done on the first floor, in the kitchen next to the door into the utility room.

strike a pose
Laine at the end of a hard working weekend!









